Project
Polydeck have completed the flooring refurbishment within one of Royal Mail’s prime sites in London.
Solution
The works were carried out on fast track programme to an area of 18,000m².
The products used were: Specially modified sub screeds, with mechanical expansions joints, finished with a flexible polyurethane elastomeric resin floor finish.
The final floor finishes provide a hard- wearing impact resistant finish, with excellent crack-bridging capacity to reduce the likelihood of cracks in the structure reflecting through the resin finish.